If any homeowners need a copy of the Bylaws, CCRS, Easements and other legal documents related to their property, they can obtain those from the title company that was involved in the purchase of their unit.
Join us for a potluck dinner party in the Neskowin Resort meeting room. Please bring a main course, an appetizer dish or desert of your choice.
January 31, 2011 From our contractor, Larry: "We're just finished with the siding on the 1st building and have started replacing windows in 107, 207 and 307. We are in the process of removing the shingles and sheetrock on the south side of the bumpout section. We lost time today as we found that some [...]
December 31, 2010 Construction Update: After consultation with the contractor, it was decided that rather than begin demolition of the third and final section of the decks his crew would install the siding on Sections 1 and 2. We expect that project to take at least a week, perhaps longer. While Ken and Joyce do [...]
This a statement from Larry, the contractor doing the deck and siding installation: "We will have all of the decks [middle section of building] useable and safe by the 24th. The second floor deck is on and we are setting the beams for the third floor deck as I write this. We will be finishing [...]
Construction Update: The decks and repairs on the middle section are now complete. Replacement doors and windows may still need installation as the supplies come in. No further construction will take place until January 3 so homeowners can enjoy their units or rent them as they choose. Decks do not have the dividers up between [...]
November 1, 2010 An update from Bruce, regarding the siding/decking project: "Things continued slower than we would like. The flu attacked the entire crew keeping progress slow. "The deck boards are on the 2nd floor and the posts and beams are on the 3rd floor for the first 30 foot section. "They will be increasing [...]
Bruce reports that the work is going slower than anticipated due to some surprises the contractor found under the old siding. Expecting to find plywood as the backing for the siding, they found plywood of varying thicknesses, or no plywood at all, or even, unbelievably, drywall! Fortunately, not much dry rot was discovered. While that [...]